Stable event identity
passdpdp-phase-2-consent-manager-2026 is tied to India DPDP Phase 2 — Consent Manager Framework Live; category Regulatory; status scheduled.
It took place on Friday, November 13, 2026 (2 days ago).
Data Protection Board begins registering consent managers; intermediary framework activates.
DID answer evidence
This audit checks the stored event identity, source, decision date, uncertainty posture, related-event context, and archive behavior behind the yes/no answer.
dpdp-phase-2-consent-manager-2026 is tied to India DPDP Phase 2 — Consent Manager Framework Live; category Regulatory; status scheduled.
Friday, November 13, 2026 is the date compared against Sunday, November 15, 2026 (2026-11-15 UTC).
The answer keeps a direct citation to en.wikipedia.org; late changes are not inferred from the page copy.
The stored date is 2 days behind the static decision date, so the answer is yes.
No verified start time is retained, so this page stays date-first instead of implying a midnight launch.
No estimated-window flag is attached; scheduled/confirmed status is still source-checkable.
country India and region India
The event description is used as the context floor.
6 related tracked events are linked or summarized for crawl context.
Current render posture for this locale is index, follow; past English DID pages remain indexable only for 30 days.
10 decision rows are rendered, covering answer state, source confidence, timing precision, status, uncertainty, entity shape, aliases, and related context.
FAQ schema stays limited to answer and verification questions; no event schema is inflated from the yes/no companion page.
Answer lifecycle
Before the date
Answer remains no
Upcoming records point users to /countdown/dpdp-phase-2-consent-manager-2026/ when the canonical countdown is still inside the index window.
On the date
Date-current answer
The static answer avoids claiming completion by hour when no verified end state is stored; use the source for live access or release status.
After the date
Answer flips to yes
The page becomes an archived yes/no answer and keeps source, date, entity, and nearby-event context together.
30-day archive boundary
Still inside index window
Older DID answers remain reachable for users and internal context but leave the index after 30 days to avoid stale long-tail clutter.
Claim boundaries
What the answer proves
It compares the retained event date for India DPDP Phase 2 — Consent Manager Framework Live with a static decision date and answers the direct did-it-happen query.
What it does not prove
It does not confirm ticket access, livestream availability, release rollout timing by region, venue admission, cancellation handling, or local time unless those fields are explicitly stored.
When to use the source
Use en.wikipedia.org for late changes, exact access details, event postponements, regional releases, or organizer-specific status updates.
Why it is separate from countdown
The countdown page serves planning intent; this page serves answer intent and keeps the claim narrower so it can archive safely after the event passes.
Answer context
Decision record
Stored date, status, source, category, timing, and related-event fields behind the answer.
India DPDP Phase 2 — Consent Manager Framework Live is past. The stored date is Friday, November 13, 2026; the static answer is yes, with 2 days elapsed at render time.
scheduled date backed by en.wikipedia.org.
Tracked span: Friday, November 13, 2026. Start-time field: No verified start time stored; this answer is intentionally date-first.
Static render date is Sunday, November 15, 2026 (2026-11-15 UTC). The answer flips to yes only when the stored event date is before that UTC calendar date; same-day events remain date-current until the next static calculation.
Catalog status scheduled; schema eventStatus EventScheduled. Category regulatory; region India; country India.
No estimated window, expected-status flag, previous-start override, or signal tracker is attached.
elapsed 2 days and indexable detail path /did/dpdp-phase-2-consent-manager-2026/
country India and region India
No series, installment, or alternate-name metadata is attached.
EU CBAM First Certificate Surrender [regulatory, scheduled, 2026-09-30] · India Census 2027 Phase 1 (House Listing) Closes [regulatory, scheduled, 2026-09-30] · Chhath Puja 2026 [religious, scheduled, 2026-11-15] · Diwali 2026 [festival-hindu, scheduled, 2026-11-08] · The Lord of the Rings: The Rings of Power Season 3 [release-tv, expected, 2026-11-11]
Related tracked events